PROBLEM SOLVING

E-commerce and operations case studies

These examples show how I approach operational friction: understand the cause, design a practical response and measure whether it improved the customer or commercial outcome.

01

CUSTOMER EXPERIENCE · RETURNS

Stopping avoidable returns before dispatch

THE PROBLEM

Some products had a known risk of being unsuitable for particular customer needs, creating preventable returns and disappointment.

WHAT I DID

I introduced targeted pre-dispatch messages for relevant orders, explained the likely issue and recommended a more suitable alternative before the parcel left.

THE OUTCOME

Around 40% of the customers contacted accepted the alternative, improving product fit while avoiding unnecessary shipping and return activity.

02

SERVICE RECOVERY · COMMERCIAL JUDGEMENT

Turning return requests into retained customers

THE PROBLEM

A return request does not always mean the product has failed; sometimes the issue is setup, compatibility or a replaceable defect.

WHAT I DID

I used practical troubleshooting, clarified the root cause and offered replacements where that genuinely gave the customer a better outcome.

THE OUTCOME

Approximately 20% of suitable potential returns were converted into replacements, reducing lost sales without pressuring customers to keep the wrong product.

03

INVENTORY · DATA

Reducing overselling in uneven demand

THE PROBLEM

Relying on a single recent sales figure could distort replenishment decisions when demand was volatile or supplier lead times changed.

WHAT I DID

I combined mean and median sales patterns with lead time and current availability, using judgement to identify outliers and set safer stock decisions.

THE OUTCOME

The method improved visibility of genuine demand and helped reduce overselling and avoidable stockouts across active listings.

04

PROCESS AUTOMATION · TOOLS

Replacing repetitive pricing and SKU work

THE PROBLEM

Building CCTV bundles and importing product variations required repetitive manual calculation and data entry, increasing time and error risk.

WHAT I DID

I built an eBay CCTV bundle price calculator and a tool that imports SKU variations into a one-click price and SKU table.

THE OUTCOME

Both tools became part of daily operations, making repeat tasks faster, more consistent and easier for colleagues to use.

05

PRODUCT LAUNCH · GROWTH

Taking new products from listing to steady demand

THE PROBLEM

New products needed the right catalogue structure, content, channel setup and availability to earn traction rather than simply go live.

WHAT I DID

I supported listing creation, product content, operational readiness, inventory and early marketplace monitoring across launches.

THE OUTCOME

Successful launches typically added around 15–20 orders per day, with two to three products introduced annually.

06

FULFILMENT · PRIORITISATION

Keeping high-volume dispatch dependable

THE PROBLEM

A 4pm-to-4pm same-day fulfilment cycle creates a constant need to prioritise exceptions while hundreds of orders continue moving.

WHAT I DID

I monitored order flow, surfaced exceptions, coordinated stock and customer issues, and kept attention on the operational cut-off.

THE OUTCOME

The operation sustained approximately 99% on-time dispatch across 300–400 daily orders, with peaks around 600.

07

SUPPLIER NEGOTIATION · COST

Reducing a proposed supplier price increase

THE PROBLEM

A supplier proposed increasing a product price by $6 per unit, creating pressure on margin and the commercial viability of the range.

WHAT I DID

I challenged the increase with a structured negotiation grounded in the product, relationship and commercial context.

THE OUTCOME

The proposed increase was reduced from $6 to $3.50 per unit, protecting more of the product margin while maintaining supply.

08

SUPPLIER QUALITY · PRODUCT

Turning defects and shortages into better supplier outcomes

THE PROBLEM

Supplier deliveries could include defects, shortages or product details that did not fully match operational and customer needs.

WHAT I DID

I documented the issue, communicated the evidence clearly and negotiated the most appropriate remedy, including replacement goods, price reductions or design changes.

THE OUTCOME

The response protected availability and customer outcomes while improving clarity with suppliers for future orders.

09

PRODUCT DEVELOPMENT · BRAND

Building a CCTV camera brand for online marketplaces

THE PROBLEM

Launching a new camera brand required the product, technical specification, identity, supply and marketplace execution to work as one commercial system.

WHAT I DID

I led research and development activity, coordinated brand design and technical specifications, and managed the Amazon and eBay launch and supporting supply-chain work.

THE OUTCOME

The brand reached approximately 18,000 CCTV camera sales annually.

10

CONTRACT CONTROL · GOVERNANCE

Stopping an invalid document before payment

THE PROBLEM

Development-project documents needed careful review before reaching the payment stage, where errors or irregularities could create financial and governance risk.

WHAT I DID

I checked the supporting document against the contract and expenditure requirements, identified that it was materially invalid and stopped it from being submitted for payment.

THE OUTCOME

The control prevented an improper document from progressing and protected the integrity of the approval process.